<img height="1" width="1" src="https://www.facebook.com/tr?id=373327176680496&amp;ev=PageView&amp;noscript=1">
Top 10 Project Starts in the U.S. - June 2023 Blog Feature

By: Alex Carrick on July 17, 2023

Print/Save as PDF

Top 10 Project Starts in the U.S. - June 2023

The accompanying table records the top 10 project starts in the United States for June 2023.

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when jobsite work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Click here to download the Construction Industry Snapshot Package - June 2023 PDF.

Click here for the July 2023 Industry Snapshot article, June’s Nonresidential Construction Starts +26% M/M, +11% Y/Y, and +5% YTD.

Click here for the Nonresidential Construction Starts Trend Graphs - June 2023.

Top 10 Project Starts in the U.S. - June 2023
LOCATION
(East to
West)
TYPE OF
CONSTRUCTION
DESCRIPTION
Sq. Ft.
000s*
Dollars
000,000s
New York        
Orchard Park Commercial New Buffalo Bills Stadium 1,350 $1,350
    (2 structures; 6 stories; 60,015 seats) 1 Bills Dr    
    Erie County - Department of Environment and Planning    
         
New York Civil/Engineering Grand Central Terminal Trainshed and Park Avenue Tunnel And Viaduct * $895
    (2 structures) Multiple Locations    
    New York Metropolitan Transportation Authority    
         
Virginia        
Sterling Commercial CloudHQ LC4 Data Center 1,400 $1,000
    (1 structure; 3 stories) 22200 Loudoun County Pkwy    
    CloudHQ / Dalian Development    
         
Florida        
Kissimmee Residential Everest Place Mixed-Use (Residential, Hotel, Commercial) Development - Phase One 3,000 $1,000
    (7 structures; 2,476 units) 3250 FL-429    
    Everest Group    
         
Ohio        
Jersey Township Industrial Intel Silicone Heartland Chip Factory Development - Phase 1 2,500 $1,500
    (1 structure)    
    Intel Corporation    
         
Indiana        
Indianapolis Commercial Eleven Park (Home of Indy Eleven soccer team) 1,200 $1,000
    (7 structures; 20,800 seats) 402 Kentucky Ave    
    Keystone Construction Corp    
         
Alabama        
Decatur Industrial First Solar Inc Photovoltaic (PV) Solar Module Manufacturing Facility 2,400 $1,100
    (1 structure) US-72 ALT & Woodall Rd SW    
    First Solar, Inc.    
         
Texas        
Bridge City Civil/Engineering Orange County Advanced Power Station * $1,800
    (2 structures) Orange County    
    Entergy Texas Inc    
         
Wyoming        
Rawlins Civil/Engineering TransWest Express Transmission Project (Electric Power) * $3,000
    (1 structure) Carbon County    
    Anschutz Corporation    
         
Hawaii        
Honolulu Institutional Dry Dock 3 Replacement 500 $2,800
    (1 structure) 667 Safeguard St    
    U.S. Department of the Navy - NAVFAC Pacific    
         
TOTALS:     12,350 $15,445
*A square footage measure does not apply for alteration, some forms of industrial (e.g., petrochemical), and engineering/civil work.
Data source and table: ConstructConnect.

About Alex Carrick

Alex Carrick served as Chief Economist at ConstructConnect for over 39 years. He retired in 2024.